Contact us


    TEL:022-24832616
    FAX:022-24982771
    PHONE:13820942008
    MALI:tjbobeijd@163.com
    ADDRESS:Dongli Economic Development Zone, Tianjin, 11 weft Road, No. four, Fortune Plaza, A, block B, floor 29, No. 8

您当前的位置:Home >> News Center >> Company >> Browse

Engineering supervision of the lifting project

Time:2017-11-29  Author:  Hit:1015

The scene is a key step to make lifting test stage work, but also an important part of the civil inspection of steel structure and embedded conditions, usually under the supervision of steel structure to do the following aspects: site installation supervision should be before installation and production plant for all pier beam elevation, pier beam spacing, supporting the data center moment the retest, was approved by the construction and supervision of welding deformation control scheme.
     In the lifting process of lifting, lifting scheme and even transportation (Municipal Engineering) should be carried out together with all aspects of the parties involved in the coordination of the owners.
     After the hoisting of the assembly between the beam assembly and the bearing seal inspection.
     After the lifting of the completion of the field of the main force of the welding seam surface quality, damage control, coating for supervision, and the length of the deck, width, arch degree of the main scale of supervision.
     As the steel structure scale tend to millimeter scale construction tend to split construction cm calculation, easy to cause the overall lifting not anastomosis or local rework. To this end should be close to the completion of the production, should be coordinated in advance to avoid errors. In short, the site supervision requires supervision personnel in the ground, strict, detailed, real work.