Safety operation rules for heavy industry
Time:2016-12-11 Author: Hit:1040
1 from heavy industry should be trained by professional security, and the examination of qualified operators to participate in the operation of the operator, to participate in the operation.
Must wear safety helmet 2 before work, strict inspection of various types of equipment, tools, rigging is intact and reliable. Overload is not allowed to use. The rope is not allowed to be used in mechanical transmission.
3 field power equipment must be reliable, good insulation, mobile lighting to use safe voltage.
United more than 4 operations of a person responsible for the command signal, clear. Strictly according to the command or signal. If the operator can not see the command gesture, should be set up assistant, accurate signal transmission.
5 lifting work, should first check whether the firm tied the rope through the angular, fast mouth pad should be located, then try hanging 0.5 meters from the ground, it was confirmed safe and reliable before lifting.
6 use of lifting pole positioning to the right, back to be reliable, the cable wind rope fastened to produce twisting, sink, oblique phenomenon in force after.
7 hoist operation must obey the command, see the signal, correct operation. Strictly do: the signal is unknown, wire rope deviation, overload, brake drive. As the traction winch, the middle without slip are not allowed to work.
8 using the jack, the base should be solid, placed smoothly, the correct choice is lifting objects supporting point and balance point; the top cover and the weight between cushion block or mat; slow lifting, with top with pad, multiple lifting, to the action. When using the claw jack, not in front of the operation, in order to prevent the damage caused by Jack falling.
9 the use of cable wind rope should be no less than two, fixed position to be firm, not tied to the wire rod, mechanical and electrical equipment and pipeline support, etc.. The angle between the cable and the ground should be less than 45 degrees. Need to be fixed in the field of building components, subject to the consent of the relevant departments.
10 moving objects with high center of gravity, ground must be neat, hard sleeper pads, tank wheels and objects mat mat, the key point to accurately select and balance. When necessary, use a magnet to follow the movement of the wood. Staff need to be highly vigilant.
11 around the region should be set warning line, non - staff access is strictly prohibited. In the case of more than 6 winds, the lifting of the lifting of the lifting is strictly prohibited.
12 before lifting the object in place, do not leave the job. Don't interrupt work force in the rigging or lifting hanging case.
13 hanging suspended, no stopping or by hanging objects, or under the crane arm in the hoist, the pulley and wire rope traction side of the station were closed.
14 to wear a safety belt and comply with the relevant safety operation procedures when operating at high altitude or using other mechanical and electrical equipment